fbpx Onsite Gap Assessment | University of Kentucky College of Engineering

Onsite Gap Assessment

×

Error message

  • Deprecated function: Creation of dynamic property MemCacheDrupal::$bin is deprecated in MemCacheDrupal->__construct() (line 30 of /mnt/www/html/ukyengineeringbzaacnspwk/docroot/sites/all/modules/memcache/memcache.inc).
  • Deprecated function: Creation of dynamic property MemCacheDrupal::$wildcard_flushes is deprecated in MemCacheDrupal->reloadVariables() (line 637 of /mnt/www/html/ukyengineeringbzaacnspwk/docroot/sites/all/modules/memcache/memcache.inc).
  • Deprecated function: Creation of dynamic property MemCacheDrupal::$invalidate is deprecated in MemCacheDrupal->reloadVariables() (line 638 of /mnt/www/html/ukyengineeringbzaacnspwk/docroot/sites/all/modules/memcache/memcache.inc).
  • Deprecated function: Creation of dynamic property MemCacheDrupal::$cache_lifetime is deprecated in MemCacheDrupal->reloadVariables() (line 639 of /mnt/www/html/ukyengineeringbzaacnspwk/docroot/sites/all/modules/memcache/memcache.inc).
  • Deprecated function: Creation of dynamic property MemCacheDrupal::$cache_flush is deprecated in MemCacheDrupal->reloadVariables() (line 640 of /mnt/www/html/ukyengineeringbzaacnspwk/docroot/sites/all/modules/memcache/memcache.inc).
  • Deprecated function: Creation of dynamic property MemCacheDrupal::$cache_content_flush is deprecated in MemCacheDrupal->reloadVariables() (line 641 of /mnt/www/html/ukyengineeringbzaacnspwk/docroot/sites/all/modules/memcache/memcache.inc).
  • Deprecated function: Creation of dynamic property MemCacheDrupal::$cache_temporary_flush is deprecated in MemCacheDrupal->reloadVariables() (line 642 of /mnt/www/html/ukyengineeringbzaacnspwk/docroot/sites/all/modules/memcache/memcache.inc).
  • Deprecated function: Creation of dynamic property MemCacheDrupal::$flushed is deprecated in MemCacheDrupal->reloadVariables() (line 643 of /mnt/www/html/ukyengineeringbzaacnspwk/docroot/sites/all/modules/memcache/memcache.inc).

Onsite activity where True Lean™ practicioners assess current condition and review existing lean plans & activities. We then partner with your organization’s leadership to develop a Master Plan for you to develop your System – to begin, or to continue on, your True Lean™ journey.

Outline

  1. Pre-work & discussions to ensure onsite activities are efficient and not disruptive to operations
  2. Opening meeting with key leaders & stakeholders
  3. True Lean™ instructors “go & see” to assess:
    • Leadership alignment; 
    • People & culture indicators; 
    • Operations & support functions processes;
    • Problem-solving methodologies;
    • Standardization; and,
    • Other areas as determined in the pre-work discussions
  4. Report-out to key leaders & stakeholders, high-level overview of findings, along with recommendations for both short- and long-term countermeasures / activities
  5. Begin development of Master Plan
  6. Closing meeting

 

Location & Length:

  • Client location (3 days)

Fees: Size of organization determines number of True Lean assessors needed, impacting costs

Contact Sandra Dunn to begin the process for your customized assessment